Lübeck Automation — Assembly stations, leak testing, and automated cell integration
// Industrial Automation

Your next assembly or leak test station, designed in 3D before a single part is manufactured.

No rework. No integrators that disappear after FAT.

For manufacturing engineers and managers in Mexico who need a technical integrator that won't fail them on the floor — or on the timeline.

I want you to review my project
// Diagnosis

Do any of these scenarios sound familiar?

01

You received the machine, started assembly, and only then discovered the design errors. The timeline was already compromised and your customer was waiting.

02

Test equipment generates false positives or false negatives. Quality rejects batches. The manufacturer's explanation arrives two days later because they're in a different time zone.

03

The machine works, but no one else can maintain it because it was designed with non-standard parts. Every spare part is a special procurement process with the same supplier that already failed you once.

Lübeck integration workshop
// Objections

We know why you stick with the same integrators even when they're not the best.

01

They're already registered in SAP. Changing suppliers has a real administrative cost and you don't have time for that in the middle of a launch.

02

What if this new integrator doesn't deliver either? The risk of trying someone new with a CAPEX project is yours, not purchasing's. And you know it.

03

The approved budget may not cover what you actually need. You'd rather not find out until there's no turning back.

// Process

How we work a project with you

01 Days 1-3

Technical evaluation

We review the requirement with you: cycle time, tolerances, space constraints, and acceptance criteria. No commitment. No quote yet. We just determine whether we can help you properly — and whether your budget is realistic for what you need.

02 Days 4-15

3D technical concept

We develop the proposal with 3D design validation before touching a single part. You approve the concept before the first invoice arrives.

03 Weeks 3-10

Manufacturing + documented FAT

We manufacture using commercial-brand components we distribute directly. We document the FAT with video and a technical protocol you can present to your customer or auditors.

04 Post-installation

On-site startup + support

We're with you at startup. We don't disappear after FAT. If something needs adjustment in the first months of operation, we respond — because we built the machine.

// Solutions

Three types of integration we solve

Lübeck dual assembly station
Assembly

Assembly stations

Design and integration of dual stations with cycle validation, ergonomic tooling, and complete operation documentation.

Lübeck leak test station
Leak testing

Leak test stations

Leak test stations with CTS instruments, validated sealing fixtures, and certified calibration. We eliminate false rejects.

Lübeck automated cell
Cells

Automated cells

Assembly and fastening cells with press, dual monitoring, and automatic component feeding. Heavy-duty for continuous production.

// Commitment

We'd rather tell you no in time than take your project and fail you on the floor.

Before quoting, we analyze whether your requirement is technically viable and whether your budget is realistic for the production rate you need to achieve.

We don't inflate scope to close a sale. We won't sell you a $300,000 machine if your project actually needs $180,000. And we won't sell you an $80,000 one if that means delivering something that won't work in your first month of production.

98% of our integrations operate without post-installation rework.
// Filter

We're not your supplier if:

  • You're looking for the lowest-price integrator regardless of the technical backing behind it.
  • You need a proposal in 24 hours without going through a real technical review of your requirement.
  • Your project still has no defined budget or real purchase decision.
  • You expect the supplier to absorb scope changes at no additional cost because "that's how everyone else does it."
// Evidence

Projects that speak for us

+8 Years integrating in Mexico
+80 Equipment designed and integrated
+100 Manufacturing clients

Leak Test (Toyota Line)

Problem: +30% scrap due to false rejects from an unstable fixture.

Solution: Structural redesign of the nest and sealing system optimization.

Result: Scrap eliminated, clear validation, and operating cost reduction.

Cylinder Leak Tester — Flexible table

Modular design enabling testing of multiple cylinder models with quick table changeover, no need to modify or reprogram the base station. Direct savings in CAPEX and floor space.

Assembly and Fastening Cells

Integration of ergonomic tooling with zero reaction torque. Elimination of workplace risk, increased operator safety, and guaranteed repeatability in every cycle.

// Contact

Tell us about your project.

Within 24 business hours we'll tell you if we can help. You won't get a generic proposal or a sales call. You'll get an honest technical response.

  • Free technical feasibility evaluation
  • Response in less than 24 business hours
  • No purchase commitment or unsolicited sales visit